Progress of works at the NAIC Shipyard and Cleaning and Stripping activities on the Air Side for the worksite.
NAIC Shipyard completes 93% of works. North Threshold: Cleaning and stripping; Aircraft apron: Deforestation and Cleaning. Panoramic aerial picture of the Landing and Take off Runway (northThreshold at the bottom of the picture)